ajnara sports city is on planning stage and construction is going to start very
soon. Buyers remain concerned about its possession time. Possession time
depends upon the construction speed and completion of the project. Ajnara group
always try to give possession of its projects on time and in past have proved
it in several of its old projects. Let’s have an insight in construction phases
and process for developing ajnara sports
city at noida extension.
Ajnara
group would first start excavation of the land and would dig it out as per the
master plan. After completing excavation architects and civil engineers would
prepare the bed of steel which would be filled with concrete. This process is
called raft casting and is the base of foundation. This raft is most important
part of building as it helps buildings in resisting earthquake as well as they
bear the load of buildings.
The
next stage would be of placing out the columns as per building floor layout and
individual flat layout. These columns spacing and placement remain same up to
top floor of the building. After casting column the basement roof slab would be
casted which would be used as per the reserve space for covered car parking.
Then the main floor work starts. In ajnara sports city casting of every floor would take twenty or more days.
Completion of structure would be in twenty four months. Construction of club
house building, sports centre, swimming pool, party hall and facilities area
would start after completion of structure of building. In conclusion the most
important aspect of construction for possession would be completed in initial
two years.